One thing we have learned building our own house is that every project has many steps before the steps before the steps it takes to finish a project. Last week we got one step closer to finishing the Master Bathroom walk-in-walk-out shower. That was to get the rough-in plumbing set into the floor.
As convenient as it might seem, we just can’t have a hole in the floor. so we connected the drain pipe (J-Trap) that was set in the ground before the concrete floor was poured. Then time to mix a little more concrete to fill up the hole. One of our next “steps” will be to build up a sloped mortar bed for the tile to go on.
In the front hall we put together a cabinet that will “hide” the ugly back of our fridge and provide storage for extra glassware, tupperware and such. It’s a nice addition to our entryway.