Over the Hump

 

With the help of Tyrell the tracked loader we made speedy work of covering the north entrance vault.  Dozy laid the ground work on Friday creating the ramp.
 The strength of our barrel-vaulted structure, especially after being bermed, is evident in this picture showing Tyrell’s heafty 5,000 lbs. parked on top of our entrance.
Today was beautiful but very hot. Even with only a part of the shell covered, it was much cooler inside.  Just one of the many benefits of an earth sheltered structure

Leave a Reply

Your email address will not be published.