Today, the guys from Lincoln Plumbing came by and installed out bathtub. After making the necessary plumbing connections it was set into a bed of mortar. To give us a bit of a thermal break from the cold concrete floor, we placeed a quarter-inch foam pad under the mortar.
(No cold bottoms sitting in the tub
The plumbers also installed the tub and shower valve and connectors. These will be connected to PEX water pipes some time down the road.
VOILA!