The guys from RK Concrete are back to finish installing the last of the rebar, vapor barrier and wire mesh.Grant having fun with an angle grinder.
We are using a special insulating vapor barrier. It has a layer of foil sandwiched between two layers of foam. The 4 foot rolls are taped together at the seams which is what Joe and Grant are doing in the above picture.
John and Grant are laying out the wire mesh that will reinforce the concrete slab. Now we wait for our inspection and good pouring weather. We were scheduled to pour on Thursday but a cold front is moving in this week and we will be getting below freezing temperatures. Not great for concrete!